Tac Air / Hangar

  • Client: Tac Air

TAC AIR is a 26,500 sq. ft. hanger with two 110’ clear-span bays. Brownlee Construction cut project cost by modifying original building design and was influential in obtaining the building permit. We self preformed site excavation, concrete/foundation work, overhead-door rail system, and BIG ASS Fan installation.

Recent Projects